OFM4: Organic land management – rotational land
What you must do to get paid for this SFI26 action and advice on how to do it.
This is a Sustainable Farming Incentive 2026 (SFI26) action. Read the SFI26 ²õ³¦³ó±ð³¾±ðÌý¾±²Ô´Ú´Ç°ù³¾²¹³Ù¾±´Ç²Ô to understand what you’re required to do under an SFI26 agreement and how to apply.
Select ‘See all updates’ at the start of this page to find out how this action has changed for SFI26 compared with SFI24.Ìý
For SFI24 actions, read theÌýSFI24 agreement holder’s information.
¶Ù³Ü°ù²¹³Ù¾±´Ç²ÔÌý
3 yearsÌý
How muchÌýyou’llÌýbe paidÌý
£132 per hectare (ha) per yearÌý
Action’s aimÌý
This action’s aim is that land managed as part of a crop rotation isÌýmaintainedÌýunder organic management.Ìý
The purpose of this is to:Ìý
-
improve soil healthÌý
-
increase biodiversityÌý
-
improve water qualityÌý
Where you can do this actionÌý
You can do this action on agricultural landÌýlocatedÌýbelow the moorland line that’s:Ìý
-
registered as ‘fully organic’ by a Defra-licensed organic controlÌýbodyÌý
-
an eligible land type (as defined in sectionÌý5.1.1 ‘Eligible land types’ in the SFI26 scheme information)Ìý
-
registered with an eligible land cover on your digital mapsÌý
-
declared with a land useÌýcode which is compatible with the eligible land coverÌý
Eligible landÌý
| Eligible land type | Eligible land cover | Compatible land use code | |
|---|---|---|---|
| Arable land used to grow crops | Arable land | Land use codes for arableÌýcrops or leguminous and nitrogen-fixingÌýcrops | Ìý |
| Temporary grassland | Arable land | TG01 | Ìý |
| Arable land lying fallow | Arable land | FA01 | Ìý |
Eligibility of protected landÌý
Sites of special scientific interest (SSSIs): Eligible – you must: Ìý
-
give notice to NaturalÌýEngland to get SSSI consent before the Rural Payments Agency (RPA) offer you an SFI26 agreementÌý
-
have received SSSI consent from Natural England before you do this action (readÌýsection 10.1Ìý‘SSSI consent’Ìýin the SFI26 scheme information for more details)Ìý
Historic and archaeological features: Eligible – you must get an SFI HEFER before you do this action (read sectionÌý5.3 ‘Land with historic or archaeological features’ in the SFI26 scheme information to find out how to do this).Ìý
Available area you canÌýenter intoÌýthis actionÌý
Total or part of the available area in a land parcel.ÌýIt’sÌýyour responsibility to check that the area you enter is eligible for this action.Ìý
You must do this action on the areaÌýentered intoÌýyour SFI26 agreement. If something happens which means you cannot complete this action on some orÌýall ofÌýthe area, you must tell the RPA in writing as soon as possible.ÌýRead section 12.2 ‘What to do if you cannot comply withÌýyourÌýagreement’Ìýin the SFI26 scheme information to find out how to do this.       Ìý
Rotational or static actionÌý
This action is rotational or static. This means you can either:Ìý
-
move its location for the second and third years of this action’s durationÌý
-
do it at the same location each year of this action’s durationÌý
What to doÌý
You mustÌýcomply withÌýthe organic standards required by your Defra-licensed organic control body on landÌýentered intoÌýthis action.Ìý
When to do itÌý
You must do this action from its start date, throughout each year of its 3-year duration.Ìý
How to do itÌý
You must do this action in a way that meets the required organic standards.Ìý
Evidence to keepÌý
You must keep a valid organic certificate and schedule for all landÌýentered intoÌýthis action. This must cover at least the full period of this action’s duration.Ìý
You must supply this evidence if we ask for it.Ìý
Other actions or options you can do on the same area as this actionÌý
You can do the following actions or options on the same area in a land parcel as this action.Ìý
| Scheme | Action orÌýoptionÌýcodes | |
|---|---|---|
| SFI 2026 actions | AGF1, AGF2, AHW10, AHW11, AHW3, AHW4, AHW5, AHW6, AHW7, AHW8, AHW9, BFS1, BFS6, CAHL1, CAHL2, CAHL3, CAHL4, CIGL1, CIGL2, CIGL3, CIPM2, CIPM3, CIPM4, CNUM2, CNUM3, CSAM2, CSAM3, PRF1, PRF2, PRF4, SOH1, SOH3, WBD3 | Ìý |
| SFI 2024 actions | AGF1, AGF2, AHW1, AHW10, AHW11, AHW12, AHW3, AHW4, AHW5, AHW6, AHW7, AHW8, AHW9, BFS1, BFS2, BFS4, BFS6, CAHL1, CAHL2, CAHL3, CAHL4, CIGL1, CIGL2, CIGL3, CIPM1, CIPM2, CIPM3, CIPM4, CNUM1, CNUM2, CNUM3, CSAM1, CSAM2, CSAM3, OFA1, OFA6, PRF1, PRF2, PRF3, PRF4, SOH1, SOH2, SOH3, SOH4, WBD3, WBD8 | Ìý |
| SFI 2023 actions | AHL1, AHL2, AHL3, AHL4, IGL1, IGL2, IGL3, IPM1, IPM2, IPM3, IPM4, NUM1, NUM2, NUM3, SAM1, SAM2, SAM3 | Ìý |
| CSHT actions from 2025 | CAB10, CAB11, CAB14, CAB16, CAB17, CAB18, CAB19, CAB2, CAB5, CAB6, CAB7, CAGF1, CAGF2, CAGF3, CAGF4, CGS25, CGS4, CHS3, CHS9, CSP13, CSP14, CSP15, CSP20, CSP21, CSP9, CSW13, CSW17, CSW19, CWD3, CWS1, CWS3, CWT2 | Ìý |
| CS options | AB10, AB11, AB14, AB16, AB3, AB5, AB6, AB7, AB8, BE1, GS3, HS3, HS9, OP1, OP2, OP4, OP5, SW1, SW11, SW13, SW2, SW3, SW4, SW5, SW6, WD3, WT2 | Ìý |
| ES options | No ES revenue options | Ìý |
If an action orÌýoptionÌýcannot beÌýlocatedÌýonÌýthe same area, you may be able to do itÌýonÌýa different area in the same land parcel. Read section 5.6 ‘LandÌýthat’sÌýalready in other funding schemes or grants’ in the SFI26 scheme information for more details.   Ìý
You can do the following actions or options on the eligible boundaries of a land parcel entered into this action: Ìý
- SFI 2026 actions: CHRW2, BND1, BND2 and WBD2
- SFI 2024 actions: CHRW1, CHRW2, CHRW3, BND1, BND2 and WBD2Ìý
- SFI 2023 actions: HRW1, HRW2, HRW3  Ìý
- CSHT actions: CHRW4
- CS options: BE3 (management of hedgerows)  Ìý
Updates to this page
-
No substantive changes have been made to this action for SFI26 (compared with the SFI24 version). There have only been minor updates to standard wording which appears in all area-based SFI actions. See ‘Eligibility of protected land’ and ‘Available area you can enter into this action’.
-
AHW4 added to SFI 2024 actions.
-
Where you can do this action - an eligible land type is defined in section 5.1 ‘Eligible land types for SFI’ in the SFI scheme information. Eligibility of protected land - updated link to section 10.3 ‘SSSI consent’ in the SFI scheme information.
-
First published.