Collection

National Infrastructure Planning Guidance Portal

Provides access to and information on the status of existing and newly published National Infrastructure Planning Guidance.

Applies to England and, in limited circumstances, to Wales and Scotland

National Infrastructure Planning Guidance Portal

This National Infrastructure Planning Guidance Portal enables quick and easy access to up-to-date National Infrastructure Planning Guidance.It is coordinated by the Ministry for Housing, Communities and Local Government (MHCLG) as a central source for all users who wish to find guidance on all aspects of the NSIP regime from pre-application through to post-consent changes, and a range of related matters.

Status of National Infrastructure Planning Guidance

National Infrastructure Planning Guidance

Until 23 July 2026, the following National Infrastructure Planning Guidance is in force:

National Infrastructure Planning Guidance from 24 July 2026

As of 3 July 2026, the following guidance has been published, will come into force on 24 July 2026 and will replace the existing guidance, as set out below:

New Guidance published 3 July 2026 To replace the following existing guidance as of 24 July 2026
Planning Act 2008: Introduction to National Infrastructure Planning Guidance (July 2026) – provides an introduction to the NSIP process, sets out the role and scope of the National Infrastructure Planning Guidance, and summarises the main changes from the July 2026 guidance updates. Introduction to National Infrastructure Planning Guidance (April 2024)
Planning Act 2008: Guidance on preparing an application – Part 1: Pre-application steps (July 2026) - provides guidance on the pre-application stage for DCO applications. Planning Act 2008: Pre-application stage for Nationally Significant Infrastructure Projects (April 2024)
Planning Act 2008: Guidance on preparing an application – Part 2: Application contents (July 2026) - provides guidance on the pre-application stage for DCO applications. Planning Act 2008: Pre-application stage for Nationally Significant Infrastructure Projects (April 2024)

Planning Act 2008: application form (June 2013)
Planning Act 2008: Guidance on preparing an application – Part 3: Contents of a draft Development Content Order (July 2026) - provides guidance on the pre-application stage for DCO applications. Planning Act 2008: Content of a Development Consent Order for Nationally Significant Infrastructure Projects (April 2024)

Planning Act 2008: associated development applications for major infrastructure projects (April 2013)

Planning Act 2008: nationally significant infrastructure projects and housing (March 2017)
Planning Act 2008: Guidance on the acceptance stage of an application (July 2026) - provides guidance on the acceptance stage for DCO applications. Planning Act 2008: Acceptance stage for Nationally Significant Infrastructure Projects (April 2024)
Planning Act 2008: Guidance on the pre-examination stage of an application (July 2026)– provides guidance on the pre-examination stage for accepted DCO applications. Planning Act 2008: Pre-examination stage for Nationally Significant Infrastructure Projects (April 2024)
Planning Act 2008: Guidance on the examination stage of an application (July 2026) - provides guidance on the examination stage for accepted DCO applications. Planning Act 2008: Examination stage for Nationally Significant Infrastructure Projects (April 2024)
Planning Act 2008: Guidance on the decision-making stage of an application (July 2026) - provides guidance on the decision-making stage for accepted DCO applications. This is new guidance
Planning Act 2008: Guidance on powers to direct a project into or out of the NSIP regime (July 2026) – provides guidance on powers to direct a project into or out of the Nationally Significant Infrastructure Project regime This is new guidance
Planning Act 2008: Infrastructure Planning (Fees) Regulations 2010 - cost recovery by The Planning Inspectorate and Public Bodies (July 2026) - provides guidance on cost recovery by the Planning Inspectorate and public authorities and updated to reflect changes made through the Planning and Infrastructure Act 2025. Planning Act 2008: Infrastructure Planning (Fees) Regulations 2010 - cost recovery by The Planning Inspectorate and Public Bodies (June 2026)

As of 24 July 2026, the following guidance documents remain in force. Proposed revision dates (if relevant) are outlined below:

Existing National Infrastructure Planning Guidance Expected review date (where relevant)
Planning Act 2008: Fast-Track process for Nationally Significant Infrastructure Projects (April 2024) 2027
Planning Act 2008: awards of costs - examinations of applications for development consent orders (July 2013) 2026
Planning Act 2008: changes to Development Consent Orders (December 2015) 2027
Planning Act 2008: Infrastructure Planning (Fees) Regulations 2010 (May 2019)
Planning Act 2008: procedures for the compulsory acquisition of land (September 2013) 2027
Planning Act 2008: Guidance on the process for carrying out a review of existing National Policy Statement (June 2026)

Transitional arrangements

Where guidance is revised during the lifecycle of a DCO application, applicants should refer to each specific guidance section for details of any transitional arrangements in place that deal with this.

Keep up to date

To register for a notification of when new National Infrastructure Planning Guidance is published, please click on the “Get emails about this page” button at the top of this page.

Updates to this page

Published 17 April 2024
Last updated 3 July 2026 Show all updates
  1. Updated National Infrastructure Planning Guidance Portal.

  2. Added guidance on Pre-application; Fast-track; Content of a Development Consent Order; Acceptance; Pre-examination; and Examination.

  3. First published.